閑置很久燃?xì)獍l(fā)電機(jī)組的檢驗(yàn)標(biāo)準(zhǔn)

返回 2023.12.21 來(lái)源:http:// 0
檢查機(jī)組的啟動(dòng)成功率
Check the success rate of unit startup
試驗(yàn)方法:試驗(yàn)應(yīng)在符合產(chǎn)品技術(shù)條件規(guī)定的準(zhǔn)備啟動(dòng)狀態(tài)下,每給一個(gè)啟動(dòng)指令,啟動(dòng)成功后突加功率為1.0的50% 的額定負(fù)載運(yùn)行5min,再停機(jī)。
Test method: The test should be conducted in a ready to start state that meets the technical specifications of the product. After each successful start command is given, a 50% rated load with a power of 1.0 should be suddenly applied to run for 5 minutes, and then the machine should be stopped.
試驗(yàn)100次。啟動(dòng)成功率應(yīng)大于99%。
Test 100 times. The success rate of startup should be greater than 99%.
否則,則認(rèn)為此項(xiàng)不合格。
Otherwise, it will be considered as unqualified.
檢查機(jī)組平均故障間隔期
Check the average interval between failures of the unit
檢查方法:機(jī)組帶cosФ=0.8的額定負(fù)載,連續(xù)或累計(jì)運(yùn)行1000h以上,焦化機(jī)發(fā)電機(jī)均不應(yīng)出現(xiàn)故障,控制電路的 元件不應(yīng)出現(xiàn)二次以上故障
焦化發(fā)電機(jī)組
Inspection method: Unit with cos Ф= With a rated load of 0.8 and continuous or cumulative operation for more than 1000 hours, the coking machine generator should not have any faults, and the components of the control circuit should not have more than two faults
否則,則認(rèn)為此項(xiàng)不合格。此項(xiàng)指標(biāo)允許在實(shí)際運(yùn)行中進(jìn)行考核。
Otherwise, it will be considered as unqualified. This indicator allows for assessment in actual operation.
檢查機(jī)組帶可控硅負(fù)載的運(yùn)行情況
Check the operation of the unit with thyristor load
試驗(yàn)方法:機(jī)組帶cosФ≥0.5的三相可控硅整流器負(fù)載,在機(jī)組額定容量的10%~50%范圍內(nèi)任一點(diǎn)上均應(yīng)能穩(wěn)定工作 。
Test method: Unit with cos Ф≥ A three-phase thyristor rectifier with a load of 0.5 should be able to operate stably at any point within the range of 10% to 50% of the rated capacity of the unit.
如果產(chǎn)生低頻振蕩,應(yīng)實(shí)行調(diào)整,使之能穩(wěn)定工作,否則認(rèn)為此項(xiàng)不合格。
If low-frequency oscillation occurs, adjustments should be made to ensure stable operation, otherwise it is considered unqualified.
檢查自動(dòng)化機(jī)組的聯(lián)動(dòng)試
Check the linkage test of the automation unit
檢查方法:兩臺(tái)機(jī)組應(yīng)互為主備用,任選一臺(tái)作主用,人為切斷市電,主用機(jī)組自動(dòng)啟動(dòng)成功后供電。
Inspection method: Two units should be used as primary and backup for each other, with either unit being selected as primary. The mains power should be manually cut off, and the primary unit should automatically start and supply power.
制造一個(gè)故障 ,使主用機(jī)組自動(dòng)停機(jī)備用機(jī)組則應(yīng)自動(dòng)成功后供電。
Create a fault that causes the main unit to automatically shut down, and the backup unit should automatically supply power after successful operation.
使市電恢復(fù)后,備用機(jī)組應(yīng)級(jí)自動(dòng)停機(jī)。
After restoring the mains power, the standby unit should automatically shut down.
如不合格,找出原因,排 除故障。
If it is not qualified, identify the cause and troubleshoot.
兩臺(tái)機(jī)組分別為主用,復(fù)試三次,如仍有一次不合格,則認(rèn)為此項(xiàng)不合格。
Two units are used as the main unit and undergo three retests. If there is still one failure, it is considered as unqualified.
檢查自動(dòng)化焦化發(fā)電機(jī)組自動(dòng)啟動(dòng)功能
Check the automatic start function of the automated coking generator set
試驗(yàn)方法:接通啟動(dòng)電源,將機(jī)組工作方式選擇開(kāi)關(guān)搬向自動(dòng),送入啟動(dòng)指令,并且人為使機(jī)組啟動(dòng)不成功,機(jī)組應(yīng) 自動(dòng)啟動(dòng)三次。
Test method: Connect the starting power, move the switch for selecting the working mode of the unit to automatic, send a starting command, and if the unit fails to start due to human intervention, the unit should start automatically three times.
試驗(yàn)三次,只要有一次不合格,復(fù)試次數(shù)加倍,若仍有一次不合格,則認(rèn)為此項(xiàng)不合格。
Test three times, and if there is one failure, the number of retests will be doubled. If there is still one failure, it will be considered as unqualified.
檢查自動(dòng)化機(jī)組的自動(dòng)補(bǔ)給裝置
Check the automatic supply device of the automation unit
試驗(yàn)方法:在控制電路電路完全聯(lián)結(jié)完畢后,將工作方式選擇開(kāi)關(guān)搬向自動(dòng)人為放水放油至低液位,應(yīng)能自動(dòng)補(bǔ)給, 當(dāng)液面上升到高液位時(shí)補(bǔ)給應(yīng)能自動(dòng)停止。
Test method: After the control circuit is fully connected, move the working mode selection switch to the automatic manual water and oil discharge to the low liquid level, which should be able to automatically supply. When the liquid level rises to the high liquid level, the supply should be able to automatically stop.
試驗(yàn)三次,只要有一次不合格,復(fù)試次數(shù)加倍,若仍有一次不合格,則認(rèn)為此項(xiàng)不合格。
Test three times, and if there is one failure, the number of retests will be doubled. If there is still one failure, it will be considered as unqualified.
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

閑置很久燃?xì)獍l(fā)電機(jī)組的檢驗(yàn)標(biāo)準(zhǔn)

檢查機(jī)組的啟動(dòng)成功率
Check the success rate of unit startup
試驗(yàn)方法:試驗(yàn)應(yīng)在符合產(chǎn)品技術(shù)條件規(guī)定的準(zhǔn)備啟動(dòng)狀態(tài)下,每給一個(gè)啟動(dòng)指令,啟動(dòng)成功后突加功率為1.0的50% 的額定負(fù)載運(yùn)行5min,再停機(jī)。
Test method: The test should be conducted in a ready to start state that meets the technical specifications of the product. After each successful start command is given, a 50% rated load with a power of 1.0 should be suddenly applied to run for 5 minutes, and then the machine should be stopped.
試驗(yàn)100次。啟動(dòng)成功率應(yīng)大于99%。
Test 100 times. The success rate of startup should be greater than 99%.
否則,則認(rèn)為此項(xiàng)不合格。
Otherwise, it will be considered as unqualified.
檢查機(jī)組平均故障間隔期
Check the average interval between failures of the unit
檢查方法:機(jī)組帶cosФ=0.8的額定負(fù)載,連續(xù)或累計(jì)運(yùn)行1000h以上,焦化機(jī)發(fā)電機(jī)均不應(yīng)出現(xiàn)故障,控制電路的 元件不應(yīng)出現(xiàn)二次以上故障
焦化發(fā)電機(jī)組
Inspection method: Unit with cos Ф= With a rated load of 0.8 and continuous or cumulative operation for more than 1000 hours, the coking machine generator should not have any faults, and the components of the control circuit should not have more than two faults
否則,則認(rèn)為此項(xiàng)不合格。此項(xiàng)指標(biāo)允許在實(shí)際運(yùn)行中進(jìn)行考核。
Otherwise, it will be considered as unqualified. This indicator allows for assessment in actual operation.
檢查機(jī)組帶可控硅負(fù)載的運(yùn)行情況
Check the operation of the unit with thyristor load
試驗(yàn)方法:機(jī)組帶cosФ≥0.5的三相可控硅整流器負(fù)載,在機(jī)組額定容量的10%~50%范圍內(nèi)任一點(diǎn)上均應(yīng)能穩(wěn)定工作 。
Test method: Unit with cos Ф≥ A three-phase thyristor rectifier with a load of 0.5 should be able to operate stably at any point within the range of 10% to 50% of the rated capacity of the unit.
如果產(chǎn)生低頻振蕩,應(yīng)實(shí)行調(diào)整,使之能穩(wěn)定工作,否則認(rèn)為此項(xiàng)不合格。
If low-frequency oscillation occurs, adjustments should be made to ensure stable operation, otherwise it is considered unqualified.
檢查自動(dòng)化機(jī)組的聯(lián)動(dòng)試
Check the linkage test of the automation unit
檢查方法:兩臺(tái)機(jī)組應(yīng)互為主備用,任選一臺(tái)作主用,人為切斷市電,主用機(jī)組自動(dòng)啟動(dòng)成功后供電。
Inspection method: Two units should be used as primary and backup for each other, with either unit being selected as primary. The mains power should be manually cut off, and the primary unit should automatically start and supply power.
制造一個(gè)故障 ,使主用機(jī)組自動(dòng)停機(jī)備用機(jī)組則應(yīng)自動(dòng)成功后供電。
Create a fault that causes the main unit to automatically shut down, and the backup unit should automatically supply power after successful operation.
使市電恢復(fù)后,備用機(jī)組應(yīng)級(jí)自動(dòng)停機(jī)。
After restoring the mains power, the standby unit should automatically shut down.
如不合格,找出原因,排 除故障。
If it is not qualified, identify the cause and troubleshoot.
兩臺(tái)機(jī)組分別為主用,復(fù)試三次,如仍有一次不合格,則認(rèn)為此項(xiàng)不合格。
Two units are used as the main unit and undergo three retests. If there is still one failure, it is considered as unqualified.
檢查自動(dòng)化焦化發(fā)電機(jī)組自動(dòng)啟動(dòng)功能
Check the automatic start function of the automated coking generator set
試驗(yàn)方法:接通啟動(dòng)電源,將機(jī)組工作方式選擇開(kāi)關(guān)搬向自動(dòng),送入啟動(dòng)指令,并且人為使機(jī)組啟動(dòng)不成功,機(jī)組應(yīng) 自動(dòng)啟動(dòng)三次。
Test method: Connect the starting power, move the switch for selecting the working mode of the unit to automatic, send a starting command, and if the unit fails to start due to human intervention, the unit should start automatically three times.
試驗(yàn)三次,只要有一次不合格,復(fù)試次數(shù)加倍,若仍有一次不合格,則認(rèn)為此項(xiàng)不合格。
Test three times, and if there is one failure, the number of retests will be doubled. If there is still one failure, it will be considered as unqualified.
檢查自動(dòng)化機(jī)組的自動(dòng)補(bǔ)給裝置
Check the automatic supply device of the automation unit
試驗(yàn)方法:在控制電路電路完全聯(lián)結(jié)完畢后,將工作方式選擇開(kāi)關(guān)搬向自動(dòng)人為放水放油至低液位,應(yīng)能自動(dòng)補(bǔ)給, 當(dāng)液面上升到高液位時(shí)補(bǔ)給應(yīng)能自動(dòng)停止。
Test method: After the control circuit is fully connected, move the working mode selection switch to the automatic manual water and oil discharge to the low liquid level, which should be able to automatically supply. When the liquid level rises to the high liquid level, the supply should be able to automatically stop.
試驗(yàn)三次,只要有一次不合格,復(fù)試次數(shù)加倍,若仍有一次不合格,則認(rèn)為此項(xiàng)不合格。
Test three times, and if there is one failure, the number of retests will be doubled. If there is still one failure, it will be considered as unqualified.